According to the survey, in 2015, Guangdong Province, is expected to add clinker production line 3 (Tong Chi Fu was stopped not count), a total of 6.82 million tons of new capacity. Mainly in Yangjiang, Meizhou, Zhaoqing three regions, namely Conch 12000t / d, oil pit 5000t / d and Resources 5000t / d. From the planned production time, the 2015 is able to play a meaningful role in the conch and oil pits two production lines, is expected to total about 2.4 million tons of clinker supply, converted four million tons of cement, China Resources Cement planned production time in December, the supply negligible.
From the geographical point of view, conch 12000t / d production line is located in western Guangdong, the PRD has little impact on the overall market, but the input of the local area, Jiangmen, Foshan and beiliu such as crowding-out effect will produce clinker, enterprises face competition Resources and Sinoma two, so the initial product launch in the market fluctuations are inevitable. 5000t / d cement clinker production line of oil pit located in the eastern region, the eastern region the current annual demand of about 20 million tons of cement, there are 300-400 million shortfall by the Fujian and Jiangxi foreign supply sources, new capacity into operation local market can digest.(http://www.lubonchem.com)